Jinhua, Zhejiang: Insulation and Purification Panel Enclosure Project for the Low-Temperature Purification Workshop at Jinzi Ham
Challenges and Solutions in This Case:
The client is a publicly traded company specializing in the production of fermented ham. The new production facility covers an area of 15,000 square meters and features a complete set of functional zones. The project required a specific cleanroom classification and effective thermal insulation. Our company collaborated with the general contractor for the cleanroom project to optimize the technical design, proposing a production solution using materials that eliminate thermal bridges in the cleanroom panel sections. This successfully addressed the functional requirements of a low-temperature production workshop that must simultaneously meet both cleanroom and thermal insulation standards. The project was completed at the end of 2025 and has now been delivered for use.